Skip to content
Ubuntu AfyaLink
A person working on a solar panel

29.76 kWp · 57.34 kWh

Engineered 30 kW three-phase architecture

Engineered to order

AfyaSolar R30

Engineered three-phase resilience for hospital-scale and large health-business loads.

From TZS 69,900,000 installed

PAYGo from TZS 17,475,000 initial + TZS 1,605,000/month for up to 60 months, subject to credit approval.

Energy-as-a-Service: TZS 3,500,000 installation + TZS 1,550,000/month (7-year service). Ubuntu AfyaLink owns and maintains the system during the service term.

Prices in TZS. VAT treatment is being confirmed. Powered by Trontek hardware, designed and supported by Ubuntu AfyaLink in Tanzania.

Installed-system quotations are valid for 14 days.

Includes standard solar array, storage, protection, mounting, installation, commissioning and local support. Final design is confirmed after assessment.

At a glance

Key specifications

Solar
29.76 kWp solar generation
Inverter
Engineered 30 kW three-phase architecture
Phase
Three-phase
Storage
57.34 kWh LiFePO₄ storage
Warranty
Confirmed in your quotation
Installation
Included (standard scope)

The exact inverter architecture is confirmed with the manufacturer during engineering.

What it is for

Best for

Small hospitals and large health businesses.

What it can power: typical examples (guidance, not a promise)

  • Whole-facility lighting and sockets
  • Cold rooms and multiple fridges
  • Laboratory, imaging support and IT
  • Water pumping and selected ward equipment

Check compatibility with your own equipment list before choosing.

We don’t promise a fixed number of backup hours: backup duration depends on what is connected. Sensitive or no-break medical loads may require a dedicated online UPS or manufacturer-specific protection. Compatibility must be confirmed from the device nameplate, surge demand and manufacturer requirements before purchase or connection.

What is included

Everything in the standard price

  • Facility energy assessment

    We review the loads that matter, outage pattern and existing electricity use before final installation.

  • Energy-efficiency check

    We identify avoidable energy waste before sizing additional generation and storage.

  • Critical-load design

    Loads are separated into critical, priority and flexible/heavy loads so limited stored energy protects the services that matter most.

  • Solar modules

    The stated PV array for the selected package.

  • Hybrid inverter

    The stated inverter class and phase configuration.

  • LiFePO₄ storage

    The stated nominal battery-storage capacity.

  • Mounting and normal BOS

    Standard rails/clamps, solar cable/connectors and normal installation consumables.

  • Electrical protection

    Appropriately sized DC/AC isolation, breakers/fusing, surge protection, battery protection and earthing for the standard design.

  • Standard transport + installation

    Normal delivery/installation allowance is built into the package price; unusual travel or civil works are confirmed separately.

  • Testing and commissioning

    System testing, safe start-up and commissioning record.

  • Monitoring setup

    Configuration of available inverter/BMS monitoring where the selected equipment supports it.

  • Customer handover

    Basic operator training, documentation and warranty-registration support.

  • Post-install check

    Recommended 30-day remote/phone follow-up to confirm operation and answer user questions.

Not automatically included

  • Major building rewiring, utility-service upgrades or replacement of an unsafe main distribution board.
  • Roof structural reinforcement, extensive civil works, trenching or unusually long cable routes beyond the standard installation scope.
  • Dedicated online UPS systems for medical equipment that requires true no-break power; these are specified separately after reviewing the equipment manufacturer requirements.
  • Remote-location travel or logistics materially above the standard transport allowance.
  • Additional PV, storage or circuits requested after the final design is approved.
  • Permits, specialist works or third-party services not included in the signed quotation.

Payment models

How each option works

Cash: you own the system immediately after full payment.

PAYGo: you own the system after all scheduled payments are completed; eligibility and final terms are subject to credit approval.

Energy-as-a-Service: Ubuntu AfyaLink owns, monitors and maintains the covered system during the service term; the facility pays for the resilience service, not for ownership of the equipment.

Delivery & installation

Standard transport and installation are included. Remote travel, civil works or non-standard electrical work may change the final quotation and are confirmed before the deposit is collected.

Treatment room at St. Therese Dispensary lit by solar power
4.2 kWsolar + battery

← All complete systems

AfyaSolar R30 · from TZS 69,900,000 installed

Request Energy Assessment
Chat with Ubuntu AfyaLink on WhatsApp (opens in a new tab)